Case Studies

Metrol has a long history of confronting technical challenges and applying our technology to provide solutions

Case Studies

  • CS1001/01

    DUAL ZONE SINGLE TRIP DRILL STEM TESTS

    BENEFITS:

    336 hours rig time saved

    Understanding zonal flow contribution

    Download

  • CS1002/01

    WIRELESS STRING DEPTH CORRELATION

    BENEFITS:

    10 hours rig time saved

    Eliminate wireline

    Download

  • CS 1002/02



    DEPTH CORRELATION DST

    BENEFITS;

    Cost effective

    Reduced rig time

    Improved Safety

    Accurate decision making

    Download

  • CS1003/05

    case-study-icon.jpg#asset:751:url

    RETROFIT 9 YEARS ON

    BENEFITS:

    Replaced failed permanent gauge system

    12% increased production

    Download

  • CS1004/01

    FLOW PROFILING USING PRO-LOG

    BENEFITS:

    Reduced rig time

    Improves transient analysis accuracy

    Download

  • CS1005/01

    MANAGED WIRELESS PERFORATING: CROSS-FIRE

    BENEFITS:

    Perforating efficiency

    Flexible technology

    Download

  • CS1005/02

    MANAGED WIRELESS PERFORATING

    BENEFITS:

    Perforating efficiency

    Flexible technology

    Download

  • CS1006/01

    WIRELESS BARRIER MONITORING

    BENEFITS:

    Well safety assurance

    Reduced operational cost

    Download

  • CS 1010/01

    case-study-icon.jpg#asset:751:url

    LONG TERM PARAGON

    BENEFITS:

    Accurate decision making

    Fast accurate reservoir profiling

    Minimal installation time

    Optimise rig time

    Increase safety

    Download