Case Studies
Metrol has a long history of confronting technical challenges and applying our technology to provide solutions
Case Studies
-
CS1001/01
DUAL ZONE SINGLE TRIP DRILL STEM TESTS
BENEFITS:
336 hours rig time saved
Understanding zonal flow contribution
Download
-
CS1002/01
WIRELESS STRING DEPTH CORRELATION
BENEFITS:
10 hours rig time saved
Eliminate wireline
Download
-
CS 1002/02
DEPTH CORRELATION DST
BENEFITS;
Cost effective
Reduced rig time
Improved Safety
Accurate decision making
Download
-
CS1003/05
RETROFIT 9 YEARS ON
BENEFITS:
Replaced failed permanent gauge system
12% increased production
Download
-
CS1004/01
FLOW PROFILING USING PRO-LOG
BENEFITS:
Reduced rig time
Improves transient analysis accuracy
Download
-
CS1005/01
MANAGED WIRELESS PERFORATING: CROSS-FIRE
BENEFITS:
Perforating efficiency
Flexible technology
Download
-
-
CS1006/01
WIRELESS BARRIER MONITORING
BENEFITS:
Well safety assurance
Reduced operational cost
Download
-
CS 1010/01
LONG TERM PARAGON
BENEFITS:
Accurate decision making
Fast accurate reservoir profiling
Minimal installation time
Optimise rig time
Increase safety
Download